We need to use your personal data to make your experience better. To comply with the General Data Protection Regulation, we need to ask for your consent before using your personal data.
Paris Nord Villepinte
from 04/11/2025 to 06/11/2025Space HALL 6
Presentation
Limited period increase of power
Limited period increase of power
Need more electrical power? No problem. If the limited period power supply level you ordered (or that your event's organiser supplied) is insufficient, this option will allow you to increase it. It is based on the power supply schedule established by the organiser, and is automatically shut off overnight.
Dates and times of limited period electrical supply :
11/01/2025 : 01.00pm - 08.00pm;
11/02/2025 : 08.00am - 08.00pm;
11/03/2025 : 08.00am - 12.00am;
11/04/2025 : 07.30am - 08.30pm;
11/05/2025 : 08.00am - 07.30pm;
11/06/2025 : 08.00am - 06.00pm.
Dates and times of 24h/24 period electrical supply :
from 11/01/2025 at 01.00pm to 11/06/2025 at 06.00pm.
This option includes:
- Installation and removal of your electrical box
- Energy use during the power supply schedule
- Technical support throughout the event
- In limited period mode, the power will be shut off during the night, according to the schedule established by the event organiser.
- If the limited period power supply level you ordered (or that your event's organiser supplied) is insufficient, this option will allow you to increase it.
31 available offer(s)
-
Limited Period Increase of Power from 8kW to 10kW
-
Limited Period Increase of Power from 6kW to 8kW
-
Limited Period Increase of Power from 3kW to 4kW
-
Limited Period Increase of Power from 1kW to 3kW
-
Limited Period Increase of Power from 4kW to 6kW
-
Limited Period Increase of Power from 6kW to 10kW
-
Limited Period Increase of Power from 4kW to 8kW
-
Limited Period Increase of Power from 3kW to 6kW
-
Limited Period Increase of Power from 10kW to 20kW
-
Limited Period Increase of Power from 4kW to 10kW
-
Limited Period Increase of Power from 3kW to 8kW
-
Limited Period Increase of Power from 8kW to 20kW
-
Increase of power from 10kW to 30kW intermittent
-
Limited Period Increase of Power from 3kW to 10kW
-
Limited Period Increase of Power from 6kW to 20kW
-
Increase of power from 8kW to 30kW intermittent
-
Increase of power from 10kW to 40kW intermittent
-
Increase of power from 6kW to 30kW intermittent
-
Limited Period Increase of Power from 4kW to 20kW
-
Increase of power from 8kW to 40kW intermittent
-
Increase of power from 6kW to 40kW intermittent
-
Increase of power from 4kW to 30kW intermittent
-
Limited Period Increase of Power from 3kW to 20kW
-
Increase of power from 10kW to 60kW intermittent
-
Increase of power from 3kW to 30kW intermittent
-
Increase of power from 4kW to 40kW intermittent
-
Increase of power from 8kW to 60kW intermittent
-
Increase of power from 6kW to 60kW intermittent
-
Increase of power from 3kW to 40kW intermittent
-
Increase of power from 4kW to 60kW intermittent
-
Increase of power from 3kW to 60kW intermittent
This service is an increase of power for electrical supply.
The supply is permanent: it will not shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
Services included
Installation and removal of the electrical fusebox
Electrical consumptions at scheduled dates and times
Technical assistance during the event
Technical features :
Diferential protection : 30mA
Dimensions : 100 x 81 x 35 cm
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
This service is an increase of power for electrical supply.
This is a limited period supply : it will shut down during the night.
On this box you have 3 single-phase sockets of 240V-16A and one three-phase socket of 400V-32A.
The total power is distributed through the 4 sockets.
Technical information:
Number of one-phased sockets : 3 sockets 240V-16A limited at 3kW.
Number of three-phased sockets : 1 female socket P17 400V - 32A.
Dimensions : Width : 37,5cm ; Depth : 30cm ; Height : 40cm.
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
Services included :
- Installation and removal of the electrical fusebox
- Electrical consumptions at scheduled dates and times
- Technical assistance during the event
If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it. For more information, please refer to the "Increasing your limited period power supply" option.
Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
- If the power level you ordered (or that your event's organiser supplied) is insufficient, you can easily increase it.
- For more information, please refer to the "Increasing your limited period power supply" option.
- Remember to provide us with an accurate floor plan. After electrical connections are installed at your stand, you will be invoiced for any repositioning.
Dates and times of limited period electrical supply :
11/01/2025 : 01.00pm - 08.00pm;
11/02/2025 : 08.00am - 08.00pm;
11/03/2025 : 08.00am - 12.00am;
11/04/2025 : 07.30am - 08.30pm;
11/05/2025 : 08.00am - 07.30pm;
11/06/2025 : 08.00am - 06.00pm.
Dates and times of 24h/24 period electrical supply :
from 11/01/2025 at 01.00pm to 11/06/2025 at 06.00pm.
-
Helpline+33 (0)1 40 68 16 16
-
Proven service providers
-
Secure payment
-
On-site delivery